ESS Announces shipment of USACE Unit to Ft. Leonard Wood, Missouri

ESS All Iron Flow BatteryESS announced it has shipped the 60kW/225kWh All-Iron Flow Battery (IFB) system under contract to the U.S. Army Corps of Engineers. The battery will be part of an integrated microgrid at Fort Leonard Wood in Missouri, where they will demonstrate long-duration storage capability for use in Forward Operating Bases (FOB). The U.S. military’s main objective is to show that delivering dry long-duration batteries to the field significantly reduces fuel usage, hauling equipment requirements and associated logistics.